Stitch No. 21

aver-007

Cable network
Created by Russian узор 7  Thanks for visiting also the original site.

Instructions:

Network of braids. Number of stitches: multiple of 8
Only RS rows are displayed in the chart.
In WS rows work all stitches as they seem. (i.e. knit knitted sts and purl purled sts)
Vertically repeat rows 1 to 16.



Knitting Chart:

 

Symbols in the Chart:
     K1 = Knit 1 stitch  (videohelp), purl in WS

     P1 = Purl 1 stitch  (videohelp), knit in WS

      C2L (Make a left slanting cable 2k sts over 2k sts, pic&videohelp)

    Cross 4 sts to the left – 2k sts over 2p st  (Slip 2 stitches to the cable needle, let it in front of work, purl next 2 stitches and then knit the 2 stitches from cable needle).

    Cross 4 sts to the right – 2k sts over 2p st  (Slip 2 stitches to the cable needle, let it back of work, knit next 2 stitches and then purl the 2 stitches from cable needle).


I can not be responsible for possible mistakes in the original version




Comments are closed.