Stitch No. 16

aver-002

Embossed rhombs of crossed lines

Translation of russian original of  Узор 2

Instructions:

The motive of diagonal diamonds. Number of stitches: multiple of 16 + 19 stitches for symmetry.
Only RS rows are displayed in the chart.
In WS rows work all stitches as you see them (i.e. knit knitted sts and purl purled sts).
Horizontally repeat the sequence of symbols between vertical red lines.
Vertically repeat rows no. 1 to 32



Chart:

Symbols in the Chart:
       K1 = Knit 1 stitch  (videohelp), purl in WS
        Cross 3 sts to the right – 2k sts over 1k st (Slip the first stitch to the cable needle, let it back of work, knit next 2 stitches and then knit the stitch from cable needle).
    Cross 3 sts to the left – 2k sts over 1k st  (Slip the first 2 stitches to the cable needle, let it front of work, knit next stitch and then knit the 2 stitches from cable needle).

For basic information how to cross stitches click here


I can not be responsible for possible mistakes in the original russian version




Comments are closed.