Stitch No. 15

aver-001

Cabled central strip
According to russian original of  Узор 1

Instructions:

The motive for a central strip over 32 stitches.
For this strip cast on 32 + 3 + 3 (+ 2 sts for side edges). the 3 and 3 sts on sides purl in RS, knit in WS for good look.
In the chart there are only RS desplayed.
Work all stitches in WS as you see them (i.e. knit knitted sts and purl purled sts)
Vertically repeat rows 1 to 36



Graphic Chart:
aver-001a

Symbols in the Chart:
       K1 = Knit 1 stitch  (videohelp), purl in WS
       P1 = Purl 1 stitch  (videohelp), knit in WS
      Cross 3 sts to the right – 2k sts over 1k st
    Cross 3 sts to the left – 2k sts over 1p st
    Cross 3 sts to the right – 2k sts over 1p st
   C2R (Make a right slanting cable 2k sts over 2k sts)
    C2L (Make a left slanting cable 2k sts over 2k sts)

I can not be responsible for possible mistakes in the original russian version




Comments are closed.